I have a lot of test failures because of a date check being LT 19500101. I’d like to change that threshold date/datetime. How? Modify the values in the OMOP_CDMv5.4_Field_Level.csv file?
Correct! You’ll need to modify a local copy of the threshold file and modify the date in there. This article provides instructions: Failure Thresholds and How to Change Them • DataQualityDashboard
Let me know if you run into any issues